Page 1 of 1

Recoring hard top

Posted: Thu Dec 24, 2015 1:28 pm
by Reel Easy
Has anyone recored ther hard top or fly bridge floor? I'm looking for tips or pictures of the project. Would it be easier to split the 2 halfs rather than cutting out the top? Thanks in advance.

Re: Recoring hard top

Posted: Sat Dec 26, 2015 3:13 pm
by ready123
I don't believe you can split the two halves.... also it is likely that the upper layer core is more damaged than the second layer.
I would cut out from the top having done test drilling to see if the second layer is in fact wet in the same areas.