Page 3 of 5

Posted: Thu Jan 10, 2013 5:51 pm
by Big D
Com'on Tony, make with the pics.

Posted: Thu Jan 10, 2013 6:18 pm
by Bubbabuda
1. Props off, sent out for service (ready for pick-up at prop shop)

2. Galley cushions recovered (recovered panels and cushions in forward stateroom also)

3. Sofa sleeper in saloon will get recovered ( wood trim and upholstry finished, new mattress)

4. Soft spot on srarboard bow fordeck

5. New headliner ( all wood trim off, ready to install headliner replacing new 12 volt lights galley and stateroom)

6. re-varnish saloon and galley wood

7. New flooring in saloon, galley, forward stateroom ( 7 packages and trim stacked in saloon)

8. Moving cleats and installing hawspipes on transom ( new cleats and hawspipes still in box in garage)

9. New depthfinder and thru hull transducer (In box in garage)

10. new sunbrella windshield cover (on windshield awaiting snaps)

11. install generator (on garage floor)

12 install new hatch gaskets (still in box in garage) made new screens

13. new VHF with remote mic for bridge and antenna (in box in garage)

14. new fusion radio (ordering this week during warehouse sale) new antenna in garage

15. fume, fire, and flood alarm( in box in garage)

Posted: Thu Jan 10, 2013 6:25 pm
by Big D
Alright! Hope you guys include the rest of us in your winter endeavours. Looking forward to some instruction/siggestions and questions. This is fun :)

Posted: Fri Jan 11, 2013 8:35 am
by Paul
- Generator enclosure (already done)
- new throttle/trans controls (half done)
- re upholster cockpit seats
- new steering wheel
- and probably a couple other things that I haven't thought of yet :)

Posted: Sat Jan 12, 2013 8:01 am
by guglielmo6160
somehow I missed this thread
here is my list
1. cleaning up my cabin, ( hate using the word restoration, people throw that word around to easily, restoration is a bigger deal, I like just saying cleaning up,,lol) new paint, woodwork,carpet, tv, and outlets.
2. replacing my vacuflush head system
3. aft deck carpet
4. getting rid of about 75 previously drilled holes at my helm
5. new gps set up with sounder
6. complete compounding and waxing of my hull
7 new bumpers and ss holders
8 5 new marine deck chairs
9 repair my trim tab system, as it does not work at all, so Im putting that here to
10. marine bbq grille
11. Install generator

well thats about it,,,

Posted: Sun Jan 13, 2013 2:39 pm
by The Dog House
With the relatively warm weather (~50 F) I was able to get some Winter projects on the boat finished this weekend.

I installed a Sea Dog stainless steel steering knob. I mounted the knob at 12 o'clock so I could tell where the rudder is without looking.

Image

I installed a new bilge pump. I was a little worried it might not fit low enough in the hollow keel but it fit perfectly. The top of the pump is even with the top of the hollow keel "trough".

Image

I mounted a fire extinguisher next to the galley.

Image

I added door knobs to the galley, underseat storage, and hanging locker doors. I used stainless steel fender washers to back them. The rubber pull strips keep coming out and I was afraid one day I wouldn't be able to get a door open.

Image

Image

I'm working on getting cushions with 5 inches of foam to replace the V berth cushions. My wife wants to be comfortable when we stay on the boat. :wink:

Posted: Sun Jan 13, 2013 5:27 pm
by alexander38
https://www.facebook.com/photo.php?fbid ... =1&theater

here's some of the work on my davits,

Posted: Fri Jan 18, 2013 1:09 pm
by The Dog House
Anyone else finish any winter projects lately? Pics would be great!

Posted: Sat Jan 19, 2013 8:48 am
by DOUGNASH
I am about to start a major project here in NY

Both motors will be getting totally rebuilt

Engine room will be painted

New gauges and switches at helm

Geni will be removed and will probably be replaced with new rather than rebuild

The boat is shrink wrapped, but I am waiting for my marina to put a zippered door in so I have access...

Posted: Sat Jan 19, 2013 9:31 am
by alexander38
hey guys, What we all need to do is start treads with each of our projects and up date them as we go along, That's what I've been doin' that way he can K.I.S.S...... :wink:

Posted: Sun Jan 20, 2013 9:04 pm
by Paul
Went out to the boat this weekend and installed a new set of throttle controls and a new steering wheel. Looking forward to spring.

Image

Posted: Sun Jan 20, 2013 11:23 pm
by MattSC
Paul,
Do you have the make and model number for your throttle and gear controls, I am going to be replacing mine as well before launch. I like your electronics box, one of the benefits of a hard top.

Have a bunch of projects to take care of this year, here are the major ones.
-replace saturated core on the cabin top and bow deck. Refinish non-skid
-new headliner
-new carpet for the cabin
-rebed and refinish side window frames
-rebed/refinish front window frames and replace front windows
-replace old cleats with stainless
-refinish the cockpit deck

Posted: Mon Jan 21, 2013 7:31 am
by Paul
Matt,

The controls are the "Twin S" series from Teleflex / Morse.

Posted: Mon Jan 21, 2013 8:29 am
by MattSC
Thanks Paul

Re: Winter projects...

Posted: Thu Jan 31, 2013 10:51 am
by lawyerdave71
My law office REAKS of teak oil!!!!!

I have about ten coats on my new teak platform!

75 days to splash!!! But it is 10 degrees outside today