LARK IS FINALLY COMING TOGETHER
Posted: Fri Oct 19, 2012 7:15 pm
As a lot of you know, we bought this F-32 about two years ago and have since put a lot of time, effort and money into her. We bought the boat very cheap from a guy who was essentially about to lose it to the bank.
After buying the boat, we started the clean up by removing a lot of stuff, and then cleaning all of the teak, inside and out, I replaced the swim step with a teak one, reupholstered the Flybridge seats, the dinette seats and all of the soft panels inside, dinette & forward cabin and built a custom sofa to solve two issues, one, the one in it was dirty and ugly and two, sliding it back and forth to access the port engine. and new curtains
I repowered with inline sixes and lower HP but considerably better fuel economy, we cleaned and painted the bilges and built stainless drips pans for the enignes
I replumbed all of the holding tank and head plumbing
I replaced the galley and head counter tops with corian and new deep sinks and a new refrigerator.
I'll haul the boat this spring and have the bottom painted and replace the engine intake thru hulls and fill in all other underwated opeings.
I just ordered 20 yards of Navy Sunbrella and will make a new bimini, a fly bridge cover and covers for the pulpit and hand rail at the cockpit
here are some photos

[
After buying the boat, we started the clean up by removing a lot of stuff, and then cleaning all of the teak, inside and out, I replaced the swim step with a teak one, reupholstered the Flybridge seats, the dinette seats and all of the soft panels inside, dinette & forward cabin and built a custom sofa to solve two issues, one, the one in it was dirty and ugly and two, sliding it back and forth to access the port engine. and new curtains
I repowered with inline sixes and lower HP but considerably better fuel economy, we cleaned and painted the bilges and built stainless drips pans for the enignes
I replumbed all of the holding tank and head plumbing
I replaced the galley and head counter tops with corian and new deep sinks and a new refrigerator.
I'll haul the boat this spring and have the bottom painted and replace the engine intake thru hulls and fill in all other underwated opeings.
I just ordered 20 yards of Navy Sunbrella and will make a new bimini, a fly bridge cover and covers for the pulpit and hand rail at the cockpit
here are some photos

[