Here's my rough plan. Remove the fuse blocks and replace them with contact strips. Run all of the fused loads to this strip. Then I can make a labeled wiring harness and run it from the strip to a new panel with the new breakers and install it the same way that the existing black panel with the hour meter is installed. Oh yeah, and up date the existing black panel as well. I spoke to a guy at a sign shop that said he could make me aluminum panels with all of the required holes cut out and labeled. I also plan on replacing the Sudbury on/off switch for the ignition circuit with a Blue Sea M series (black) on/off switch. Then I'll add a second switch of the same type right next to it that will be the main shut off for the house bank. I'll also eliminate the three pieces of existing bus duct and replace them with a custom plastic panel.
Any way, I'm still in the concept stage and still have some things to work out.
Below is the existing DC panel

This is the bus ducts open to show the existing contact strips and fuse blocks. The black panel is removed.

Below is a CAD model of what the new panels will look like. Like I said before, I still have some things to work out so there not complete.

I am open to suggestions and if anybody is interested on how this project is progressing, I'll post updates as I go along.
Well back to the drawing board.