Rebedding Rail, 10 meter midcabin
Moderators: BeaconMarineBob, Moderator, BeaconMarineDon
thanks for posting the locations
as soon as I get my stanchions back from Bob, I'll be doing the same. I really want to get this done before I do in, at least on one side. Maybe I can wait until the end of the year for the other.
I'm committed to one side, three stanchions already removed
I have some rust on one stanchion on the other side. It seems like it would be kind of tough to just re-bed one so this might force me to do the whole side.
Maybe I can run a bead around the base and do it in a couple of months.
I'm running out of steam
Maybe I can run a bead around the base and do it in a couple of months.
I'm running out of steam

- RWS
- Ultimate User
- Posts: 2857
- Joined: Sat Feb 18, 2006 7:01 am
- Location: West Coast Florida
- Contact:
If I recall correctly when we rebedded the rail in 2002, each base on my 10 meter had a large round backing plate with three holes in it.
It seems that they did not use locknuts, but used double nuts on the fasteners.
We replaced all the fasteners and used single nylon locknuts.
RWS
It seems that they did not use locknuts, but used double nuts on the fasteners.
We replaced all the fasteners and used single nylon locknuts.
RWS
1983 10 Meter SOLD after 21 years of adventures
Yanmar diesels
Solid Glass Hull
Woodless Stringers
Full Hull Liner
Survived Andrew Cat 5,Eye of Charley Cat 4, & Irma Cat 2
Trojan International Website: http://trojanboat.com/
WEBSITE & SITELOCK TOTALLY SELF FUNDED
Yanmar diesels
Solid Glass Hull
Woodless Stringers
Full Hull Liner
Survived Andrew Cat 5,Eye of Charley Cat 4, & Irma Cat 2
Trojan International Website: http://trojanboat.com/
WEBSITE & SITELOCK TOTALLY SELF FUNDED
Bob,
Did you have a survey done when you bought the boat? If so any wet spots on the decks?
I had small wet spots where I fund the rot but nothing extensive. Depending on the stanchion, you could loosen that one, pull it up a but and force some sealant in there. as long as you knw it is just a bandaid. if the decks didn't show moisture, I would just wait until you can get to the whole job in the fall.
Make sure you bed the new ones properly.
It is a decent sized job which takes two people in a few spots. and is easier with two people the whole time. I estimate about 10-12 hours of work over 2-3 days. Having done it once It would go faster the second time
Did you have a survey done when you bought the boat? If so any wet spots on the decks?
I had small wet spots where I fund the rot but nothing extensive. Depending on the stanchion, you could loosen that one, pull it up a but and force some sealant in there. as long as you knw it is just a bandaid. if the decks didn't show moisture, I would just wait until you can get to the whole job in the fall.
Make sure you bed the new ones properly.
It is a decent sized job which takes two people in a few spots. and is easier with two people the whole time. I estimate about 10-12 hours of work over 2-3 days. Having done it once It would go faster the second time
