
Work list
Moderators: BeaconMarineBob, Moderator, BeaconMarineDon
- Diverted Income
- Moderate User
- Posts: 309
- Joined: Wed Nov 28, 2012 8:18 pm
- Location: N.E. Iowa
Work list
Heat ex-changer back in. New exhaust manifolds. Raw water pumps need to go back together and install.Time to clean up the mess now. List is coming together!


1982 Trojan F-32 w/Merc 230's
1975 Baja V-1800J w/ 502 Ford
http://missriverrat.com
https://www.facebook.com/UMRMriverrat
1975 Baja V-1800J w/ 502 Ford
http://missriverrat.com
https://www.facebook.com/UMRMriverrat
Re: Work list
Looks good. I love it when a plan comes together. Be sure not to forget to double up the clamps on you starboard exhaust tube.
Paul
"Cruise Control" 1978 F-26HT
"No Control" 2012 9' Grand RIB
"Cruise Control" 1978 F-26HT
"No Control" 2012 9' Grand RIB
- Diverted Income
- Moderate User
- Posts: 309
- Joined: Wed Nov 28, 2012 8:18 pm
- Location: N.E. Iowa
Re: Work list
Or at least one clamp on the port side! Yup - ordering clamps today. Had just put the new piece on the stb side before photo.
1982 Trojan F-32 w/Merc 230's
1975 Baja V-1800J w/ 502 Ford
http://missriverrat.com
https://www.facebook.com/UMRMriverrat
1975 Baja V-1800J w/ 502 Ford
http://missriverrat.com
https://www.facebook.com/UMRMriverrat
Re: Work list
wish you were closer, I have a drawer full of those clamps in like new condition, bought a boat and the PO, had a box of em,,